Close Menu
Newsweek ArabiaNewsweek Arabia
    Latest Posts

    Abu Dhabi Judicial Department reviews AI initiatives to advance judicial, notary services

    June 13, 2026

    57th Watch and Jewellery Middle East Show features strong global participation

    June 13, 2026

    Saeed Al Hajeri meets Prime Minister of New Zealand

    June 13, 2026
    Facebook X (Twitter) Instagram
    Newsweek ArabiaNewsweek Arabia
    Facebook X (Twitter) Instagram
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Newsweek ArabiaNewsweek Arabia
    Home»Technology»FANR: Electrical generator fire outside Barakah Plant perimeter did not affect its safety, basic systems readiness
    Technology

    FANR: Electrical generator fire outside Barakah Plant perimeter did not affect its safety, basic systems readiness

    Editorial teamBy Editorial teamMay 20, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    ABU DHABI, 17th May, 2026 (WAM) — The Federal Authority for Nuclear Regulation (FANR) stated that it is continuing to closely monitor the incident involving a fire in an electrical generator located outside the inner perimeter of the Barakah Nuclear Power Plant in the Al Dhafra Region, caused by a drone strike.

    FANR confirmed that the incident did not affect the safety of the Barakah Nuclear Power Plant or the readiness of its essential systems.

    There has been no release of radioactive material, radiological safety levels remain within normal ranges, and there is no risk to the public or the environment. No injuries have been reported.

    FANR are maintaining close coordination with the plant operator and the relevant national authorities to verify all aspects of the incident and to confirm the continued integrity and readiness of plant systems.

    As part of its independent regulatory oversight, FANR is assessing the event in accordance with established national procedures and maintaining continuous monitoring of radiological conditions and plant status.

    The Barakah Nuclear Power Plant was designed, licensed, and is operated in accordance with the highest international standards of nuclear safety and security. Multiple independent layers of protection are built into every aspect of the plant’s design and operation to ensure the safe and secure production of clean electricity under a wide range of conditions.

    The protection of the public, workers, and the environment remains FANR’s highest priority. The Authority will continue to provide rigorous and independent regulatory oversight to ensure the continued safe and secure operation of the Barakah Nuclear Power Plant.

    FANR encourages the public to rely on official sources for accurate information and to avoid sharing rumours or unverified reports. Further updates will be provided as additional verified information becomes available.

    Source: Emirates News Agency

    Related Posts

    Abu Dhabi Judicial Department reviews AI initiatives to advance judicial, notary services

    June 13, 2026

    Multimodal AI is critical, says Zebra Technologies Director

    June 13, 2026

    UAEREP launches 6th Cycle research projects through its Australia Roadshow

    June 13, 2026
    Don't Miss
    Technology

    Abu Dhabi Judicial Department reviews AI initiatives to advance judicial, notary services

    By Editorial teamJune 13, 2026

    ABU DHABI, 8th June, 2026 (WAM) — Abu Dhabi Judicial Department (ADJD) has reviewed its…

    57th Watch and Jewellery Middle East Show features strong global participation

    June 13, 2026

    Saeed Al Hajeri meets Prime Minister of New Zealand

    June 13, 2026

    Multimodal AI is critical, says Zebra Technologies Director

    June 13, 2026
    Our Picks

    Abu Dhabi Judicial Department reviews AI initiatives to advance judicial, notary services

    June 13, 2026

    57th Watch and Jewellery Middle East Show features strong global participation

    June 13, 2026

    Saeed Al Hajeri meets Prime Minister of New Zealand

    June 13, 2026

    Multimodal AI is critical, says Zebra Technologies Director

    June 13, 2026
    Facebook X (Twitter) Instagram Pinterest
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    2026. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.