Close Menu
Newsweek ArabiaNewsweek Arabia
    Latest Posts

    UAE credit card fees: Customers hit with Dh400-Dh500 annual charges after fee exemption ends without warning

    September 17, 2026

    Emirates weighs switching Boeing 787 order to 777X amid delivery delays

    September 17, 2026

    SIF 2026 brings 80+ experts to discuss growth strategies

    September 17, 2026
    Facebook X (Twitter) Instagram
    Newsweek ArabiaNewsweek Arabia
    Facebook X (Twitter) Instagram
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Newsweek ArabiaNewsweek Arabia
    Home»UAE»New underground tunnel to ease Sharjah-Dubai traffic; Al Taawun monument to be rebuilt
    UAE

    New underground tunnel to ease Sharjah-Dubai traffic; Al Taawun monument to be rebuilt

    Editorial teamBy Editorial teamJune 17, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    In a major infrastructure development aimed at easing traffic congestion between Sharjah and Dubai, Sheikh Dr. Sultan bin Muhammad Al Qasimi, Supreme Council Member and Ruler of Sharjah, has announced the construction of a new double-lane underground tunnel connecting Sharjah to Dubai. 

    The project will necessitate the temporary removal of the iconic Al Taawun roundabout monument, which will be rebuilt in its original location upon the tunnel’s completion.

    On the direct line programme of Sharjah TV, the Sharjah Ruler explained the necessity of the project and the engineering challenges involved. He emphasised that the Al Taawun road has become a crucial artery linking the two emirates, prompting the decision to build the underground passage.

    Stay up to date with the latest news. Follow KT on WhatsApp channels.

    “Necessity dictates action,” Sheikh Dr. Sultan stated. “Al Taawun road has become an important route. It is the connecting road to Dubai. We came to the decision to build an underground tunnel a double underground road that will connect to the Dubai road, specifically leading to Al Nahda bridge.”

    The Ruler detailed the rigorous engineering assessments that preceded the decision. Specialised designers and engineers were brought in to inspect the site, conducting subterranean evaluations while traffic continued to flow above.

    “They inspected the foundations and saw everything,” he explained. “People were walking above, but the work was happening below. However, they reported that the foundations are deeply struck into the ground. Uprooting it from below is difficult.”

    Due to these deep-rooted foundations, it was determined that the existing monument must be dismantled to allow for the tunnel’s construction. Acknowledging the public’s sentimental attachment to the landmark, Sheikh Dr. Sultan reassured residents that the monument’s absence will only be temporary.

    “I have ordered it to be redesigned in the exact same way and returned to its place,” the Ruler affirmed. “Now, this monument will only be worked on for a short period while they pass the entry and exit roads for Al Taawun street underneath. Meanwhile, engineers will be working on redesigning and reinstalling the Al Taawun monument.”

    The primary objective of the ambitious project is to create a seamless corridor between Sharjah and Dubai, significantly improving traffic flow for daily commuters.

    “The benefit of this is that I have opened an important corridor between us and Dubai to ease the roads,” Sheikh Dr. Sultan said. “We opened these internal areas to be open to our neighbours. We want Sharjah to be a welcoming place. This monument holds cherished memories.”

    The announcement addresses public concerns regarding the dismantling of the beloved monument, clarifying that the move is a necessary step in a broader effort to enhance the region’s infrastructure and connectivity, with a firm commitment to preserving the city’s architectural heritage.

    Source: Khaleej Times

    Related Posts

    UAE credit card fees: Customers hit with Dh400-Dh500 annual charges after fee exemption ends without warning

    September 17, 2026

    Dubai’s 80km Fourth Corridor explained: Journey time cut by 60%, key road upgrades

    September 17, 2026

    UAE weather forecast: Why it’s hard to cool down today – humidity reaches 95% as fog risk builds overnight

    September 17, 2026
    Don't Miss
    UAE

    UAE credit card fees: Customers hit with Dh400-Dh500 annual charges after fee exemption ends without warning

    By Editorial teamSeptember 17, 2026

    Banking consumer protection rules require clear disclosure when free periods end. Here’s what customers are…

    Emirates weighs switching Boeing 787 order to 777X amid delivery delays

    September 17, 2026

    SIF 2026 brings 80+ experts to discuss growth strategies

    September 17, 2026

    Dubai’s 80km Fourth Corridor explained: Journey time cut by 60%, key road upgrades

    September 17, 2026
    Our Picks

    UAE credit card fees: Customers hit with Dh400-Dh500 annual charges after fee exemption ends without warning

    September 17, 2026

    Emirates weighs switching Boeing 787 order to 777X amid delivery delays

    September 17, 2026

    SIF 2026 brings 80+ experts to discuss growth strategies

    September 17, 2026

    Dubai’s 80km Fourth Corridor explained: Journey time cut by 60%, key road upgrades

    September 17, 2026
    Facebook X (Twitter) Instagram Pinterest
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us
    2026. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.