Close Menu
Newsweek ArabiaNewsweek Arabia
    Latest Posts

    Powering Possible report: 62% of energy leaders now rank AI among their top two priorities

    October 29, 2026

    Microsoft expects to raise $25 billion in US bond sale, source says

    October 29, 2026

    Himesh Reshammiya to headline IIFA Digital Awards 2027 in Abu Dhabi

    October 29, 2026
    Facebook X (Twitter) Instagram
    Newsweek ArabiaNewsweek Arabia
    Facebook X (Twitter) Instagram
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Newsweek ArabiaNewsweek Arabia
    Home»Technology»SEWA launches new project to enhance water supply in Kalba
    Technology

    SEWA launches new project to enhance water supply in Kalba

    Editorial teamBy Editorial teamApril 9, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    SHARJAH, 9th April, 2026 (WAM) — Sharjah Electricity, Water and Gas Authority (SEWA) has begun operating a new project to enhance water supply in Kalba city. The project consists of a high-capacity strategic connection between TAQA’s resources and SEWA’s distribution network, ensuring that growing demand is met efficiently and effectively. The total cost of the project reached AED47,510,444.

    Engineer Yousef Al Hammadi, Director of Kalba Department at SEWA, stated that the project has achieved a significant transformation in Kalba by adding 3 million gallons of water per day to the network. This increased the city’s water distribution capacity from 6 million to 9 million gallons per day, representing a 50 percent increase in operational capacity.

    He noted that the project was implemented with funding of AED25,650,381 from SEWA and AED21,860,063 from the Initiatives Committee of His Highness the President of the UAE.

    The project operates at full capacity around the clock (24/7) to directly supply SEWA’s reservoirs. It includes an advanced engineering system to ensure continuous supply, as well as the extension of 14.75 kilometers of pipelines with a diameter of 400 mm, known for their high quality and pressure resistance.

    The project also incorporated advanced control systems and the installation of high-standard control valves to ensure reservoir stability and prevent sudden surges. Electrical works included completing excavation and laying essential cables within the station yard to ensure full technical integration.

    Al Hammadi confirmed that Kalba’s water network is now fully ready and operating at maximum capacity. The new infrastructure guarantees sustainable and reliable water supplies that meet current consumer needs and support the city’s future expansion plans, thanks to the effective collaboration between SEWA and TAQA.

    Source: Emirates News Agency

    Related Posts

    Energy sector AI returns grow as infrastructure pressures mount, says ADNOC, XRG and Microsoft research

    October 29, 2026

    3rd edition of Foreseeing Government Audit Future Conference opens in Dubai

    October 29, 2026

    Insider incidents cost Middle East organisations US$2.41 million annually

    October 29, 2026
    Don't Miss
    Business

    Powering Possible report: 62% of energy leaders now rank AI among their top two priorities

    By Editorial teamOctober 29, 2026

    ABU DHABI, 29th October, 2026 (WAM) — AI investment and adoption are accelerating across the…

    Microsoft expects to raise $25 billion in US bond sale, source says

    October 29, 2026

    Himesh Reshammiya to headline IIFA Digital Awards 2027 in Abu Dhabi

    October 29, 2026

    Brett Lee: My only regret is not moving to Dubai earlier

    October 29, 2026
    Our Picks

    Powering Possible report: 62% of energy leaders now rank AI among their top two priorities

    October 29, 2026

    Microsoft expects to raise $25 billion in US bond sale, source says

    October 29, 2026

    Himesh Reshammiya to headline IIFA Digital Awards 2027 in Abu Dhabi

    October 29, 2026

    Brett Lee: My only regret is not moving to Dubai earlier

    October 29, 2026
    Facebook X (Twitter) Instagram Pinterest
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us
    2026. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.